The construction of an intersystem electric transmission network "Maritza Iztok - Nea Sanda" was discussed during the meeting of the Economy Minister and the Greek Minister of development Hristos Folias. The project can start by the end of 2008 and end by 2011.The two ministers signed a declaration on intentions, which calls for an intensification of the cooperation in the field of power engineering.
Source: www.international.ibox.bg
http://international.ibox.bg/news/id_94393647